RWA K 600 T * Retractable arm drive for air inlet systems for installation on doors
- 90° door opening in less than 60 seconds
- Powerful drive with high torque
- Connector cable easy to replace by means of plug
- Integrated status contact for electric strike control unit or feedback signals
- Door remains freely accessible due to the freely positioned activation of the lever by means of a pressure roller
Application Areas
- Use in the air inlet system where large opening angles are required
- Single and double leaf SHEV air inlet doors
- Installation on the hinge or opposite hinge side
Installation situations in reference objects and videos
Technical data
| RWA K 600 T | |
| Dimensions | 421 x 40 x 86 mm |
| Housing material | Aluminum |
| Compressive force | 600 N |
| Operating voltage | 24 V DC |
| Current consumption | 1.4 A |
| Residual ripple | 20 % |
| Duty rating | 30 % |
| Connector cable length | 5 m |
| Special length of connector cable | 10 m |
| Min. core cross section | 0.5 mm² |
| Number of cores | 5 cores |
| Service temperature | -5 - 75 °C |
| IP rating | IP32 |
| protection rating | III |
| Syncro function | Yes |
| Adjustable opening speed (ventilation) | Yes |
| Additional locking available | Yes |
| Type of additional locking mechanism | Locking drive |
| End position cut-off extended | Internal path sensor |
| End position cut-off retracted | Internal path sensor |
| Overload cut-off | Yes |
| Number synchronisation drive units | 2 |
Downloads
Product shot
Installation situation
Wiring diagram
Tender texts
Declaration of conformity
Installation instructions
Product brochure
Environmental declaration
Installation drawing
Product data sheet
Variants & Accessories
* Notice about the products displayed
The products mentioned above may vary in form, type, characteristics and function (design, dimensions, availability, approvals, standards etc.) depending on the country. For questions please contact your GEZE contact person or send us an E-Mail .