Perlan 140 glass with 45 mm glass clamping plate wall installation

Perlan 140 set for glass leaves * Sliding door fitting for wall installation and glass leaf

Perlan 140 Perlan 140 with 30 mm glass clamping plate wall installation / Perlan 140 glass concealed wall bracket with 30 mm glass clamping plate / Perlan 140 glass with 30 mm glass clamping plate ceiling attachment / Perlan 140 glass / Perlan 140 glass with 30 mm glass clamping plate
  • Sliding door fitting for wall installation and glass leaf with leaf weight up to 80 kg
Contact us

Sliding door fitting for wall installation and glass leaf

Application Areas

  • For wall installation
  • For leaf weights up to 80 kg
  • For glass leaves with a 30 mm glass clamping plate

Technical data

Perlan 140 set for glass leaves
Corrosion protection class 2
Glass thickness 8 - 12.76 mm
Colour EV1

Contact

UK GEZE Central +44-1543-443000 Hotline for architects +44-1543-443013 GEZE Service +44-845-017-1593